Our engineers created a set of manufacturing drawings and CNC cut files of three welded hanging frames for a reo jig. Used to manufacture a concrete pier on a new bridge, these hanging frames suspended the reo bars in a cage so they could be welded in place. The reo cage could then be lifted and placed inside the concrete footing of one of the bridge piers.
NES was supplied a conceptual design of the hanging frames and was tasked to create a set of detailed manufacturing drawings. The initial design of the hanging frames required modification for efficient manufacturing. This included adding weld preps and adjusting the connection plates to achieve the complex angles required by the design. Once the design modifications were completed, NES supplied a manufacturing package to conclude the project.